DESCRIPTION
Construction of new concert stage for Mall. Work consisted of new footing for reinforced concrete slab. The slab was an integrated color with trim design all around. New Aluminum canopy with fabric awning surrounding the stage.New sound room for all sound equipment. We ran 4″ conduits throughout open area for future connections. All electrical needed for equipment and lights, which were connected to canopy. New water feature behind stage with glass tile and underwater lighting.